{"id":14450,"date":"2025-11-26T02:39:44","date_gmt":"2025-11-26T02:39:44","guid":{"rendered":"https:\/\/www.hndfcrane.com\/?post_type=posts&#038;p=14450"},"modified":"2025-11-26T02:39:47","modified_gmt":"2025-11-26T02:39:47","slug":"yz200t-ladle-overhead-crane-for-high-temperature-molten-metal-handling-in-steelmaking-workshops","status":"publish","type":"posts","link":"https:\/\/www.hndfcrane.com\/fr\/posts\/yz200t-ladle-overhead-crane-for-high-temperature-molten-metal-handling-in-steelmaking-workshops\/","title":{"rendered":"Pont roulant de 200 tonnes pour la manutention de m\u00e9taux en fusion \u00e0 haute temp\u00e9rature dans les ateliers de sid\u00e9rurgie"},"content":{"rendered":"<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"870\" height=\"580\" src=\"https:\/\/www.hndfcrane.com\/wp-content\/uploads\/2025\/11\/YZ200t-Ladle-Overhead-Crane-for-High-Temperature-Molten-Metal-Handling-in-Steelmaking-Workshops.jpg\" alt=\"\" class=\"wp-image-14452\" style=\"width:840px;height:auto\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Profil client \u2013 MCC Oriental<\/h2>\n\n\n\n<p>MCC Oriental est un fournisseur de premier plan en ing\u00e9nierie et en \u00e9quipements pour le secteur m\u00e9tallurgique, sp\u00e9cialis\u00e9 dans la construction et la modernisation d&#39;aci\u00e9ries de grande envergure. L&#39;entreprise propose des solutions int\u00e9gr\u00e9es couvrant la production d&#39;acier, la coul\u00e9e continue, le laminage et la logistique m\u00e9tallurgique.<\/p>\n\n\n\n<p>Pour am\u00e9liorer l&#39;efficacit\u00e9 et la s\u00e9curit\u00e9 du transport du m\u00e9tal en fusion dans son atelier de fabrication d&#39;acier, MCC Oriental s&#39;est associ\u00e9 \u00e0 DAFANG CRANE pour introduire un syst\u00e8me de levage lourd de pointe. <a href=\"https:\/\/www.hndfcrane.com\/fr\/ladle-overhead-cranes\/\" target=\"_blank\" rel=\"noreferrer noopener\">pont roulant de poche <\/a>syst\u00e8me.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pr\u00e9sentation du projet \u2013 Pont roulant pour poche de coul\u00e9e YZ200t<\/h2>\n\n\n\n<p>Pour moderniser la manutention du m\u00e9tal en fusion, MCC Oriental a adopt\u00e9 le pont roulant de poche DAFANG YZ200t, con\u00e7u avec une structure \u00e0 double chariot \u00e0 quatre poutres et quatre rails.<\/p>\n\n\n\n<p>Les principales caract\u00e9ristiques techniques sont les suivantes\u00a0:<\/p>\n\n\n\n<ul>\n<li>Port\u00e9e : 28 m<\/li>\n\n\n\n<li>Hauteur de levage : 22 m (chariot principal) \/ 24 m (chariot auxiliaire)<\/li>\n\n\n\n<li>Syst\u00e8me de levage hydraulique synchrone\u00a0: 5 points de levage, erreur de synchronisation \u2264\u00a00,1\u00a0mm<\/li>\n\n\n\n<li>Deux modes de fonctionnement\u00a0: t\u00e9l\u00e9commande sans fil et commande en cabine<\/li>\n\n\n\n<li>Conformit\u00e9 aux normes : Code de conception des grues GB\/T 3811, surveillance de la s\u00e9curit\u00e9 ISO 12482<\/li>\n\n\n\n<li>Adaptation environnementale : optimis\u00e9e pour les environnements m\u00e9tallurgiques \u00e0 haute temp\u00e9rature et \u00e0 forte concentration de poussi\u00e8res.<\/li>\n<\/ul>\n\n\n\n<p>Ce syst\u00e8me a permis au client d&#39;atteindre des performances exceptionnelles dans les op\u00e9rations de transfert de m\u00e9tal en fusion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sc\u00e9narios d&#39;application principaux<\/h2>\n\n\n\n<p><strong>Transfert en poche de m\u00e9tal en fusion<\/strong><\/p>\n\n\n\n<ul>\n<li>T\u00e2che : Manutention de poches de coul\u00e9e de m\u00e9tal en fusion de 180 tonnes (\u00d8 3,5 m, H 4,5 m)<\/li>\n\n\n\n<li>Levage hydraulique synchrone + alignement laser<\/li>\n\n\n\n<li>Temps de levage r\u00e9duit de 2,5 heures \u00e0 55 minutes<\/li>\n\n\n\n<li>L&#39;\u00e9cart de verticalit\u00e9 est contr\u00f4l\u00e9 \u00e0 1\/1000 pr\u00e8s.<\/li>\n<\/ul>\n\n\n\n<p><strong>Coul\u00e9e continue de billettes d&#39;acier<\/strong><\/p>\n\n\n\n<ul>\n<li>T\u00e2che : Levage de billettes de 100 tonnes (14 m \u00d7 1,8 m) lors de la coul\u00e9e continue<\/li>\n\n\n\n<li>La conception \u00e0 quatre poutres minimise la d\u00e9flexion<\/li>\n\n\n\n<li>Fonctionnement fluide avec une r\u00e9duction du taux de rebut de 35%<\/li>\n<\/ul>\n\n\n\n<p><strong>Op\u00e9ration coordonn\u00e9e de plusieurs grues<\/strong><\/p>\n\n\n\n<ul>\n<li>T\u00e2che : Levage synchrone de deux billettes de coul\u00e9e continue (90 tonnes chacune)<\/li>\n\n\n\n<li>Synchronisation pr\u00e9cise de la vitesse et de la position<\/li>\n\n\n\n<li>Efficacit\u00e9 op\u00e9rationnelle +45%<\/li>\n\n\n\n<li>Consommation d&#39;\u00e9nergie \u201328%<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Innovations technologiques cl\u00e9s<\/h2>\n\n\n\n<p><strong>Syst\u00e8me de levage hydraulique synchrone<\/strong><\/p>\n\n\n\n<ul>\n<li>Les vannes proportionnelles et les capteurs de d\u00e9placement permettent une pr\u00e9cision millim\u00e9trique.<\/li>\n\n\n\n<li>\u00c9quip\u00e9 d&#39;une pompe manuelle de secours pour une descente en toute s\u00e9curit\u00e9 en cas de panne de courant<\/li>\n<\/ul>\n\n\n\n<p><strong>Surveillance intelligente de la s\u00e9curit\u00e9<\/strong><\/p>\n\n\n\n<ul>\n<li>Surveillance en temps r\u00e9el de 15 param\u00e8tres cl\u00e9s, tels que les contraintes sur la poutre et le tassement des appuis.<\/li>\n\n\n\n<li>Syst\u00e8me anti-collision laser 3D (port\u00e9e de pr\u00e9-alerte de 70 m, pr\u00e9cision de \u00b18 cm)<\/li>\n<\/ul>\n\n\n\n<p><strong>Conception r\u00e9sistante \u00e0 l&#39;environnement<\/strong><\/p>\n\n\n\n<ul>\n<li>Acier haute r\u00e9sistance Q460E + double couche d&#39;isolation thermique<\/li>\n\n\n\n<li>R\u00e9sistance au vent jusqu&#39;\u00e0 la classe 13<\/li>\n\n\n\n<li>Syst\u00e8me \u00e9lectrique conforme \u00e0 la norme IP67, adapt\u00e9 aux environnements extr\u00eamement chauds et poussi\u00e9reux.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Avantages et commentaires des clients<\/h2>\n\n\n\n<p><strong>Efficacit\u00e9 de la production<\/strong><\/p>\n\n\n\n<ul>\n<li>La production d&#39;acier est pass\u00e9e de 1 400 tonnes\/jour \u00e0 1 900 tonnes\/jour<\/li>\n\n\n\n<li>Le rythme de production global s&#39;est am\u00e9lior\u00e9 de 35%<\/li>\n<\/ul>\n\n\n\n<p><strong>Optimisation des co\u00fbts<\/strong><\/p>\n\n\n\n<ul>\n<li>Le syst\u00e8me hydraulique synchrone r\u00e9duit la consommation d&#39;\u00e9nergie de 38%<\/li>\n\n\n\n<li>\u00c9conomies annuelles d&#39;\u00e9lectricit\u00e9 d&#39;environ 2 millions de RMB<\/li>\n<\/ul>\n\n\n\n<p><strong>Performances de s\u00e9curit\u00e9<\/strong><\/p>\n\n\n\n<ul>\n<li>Aucun accident en six ans d&#39;exploitation<\/li>\n\n\n\n<li>Certifi\u00e9 ISO 45001 en mati\u00e8re de sant\u00e9 et de s\u00e9curit\u00e9 au travail<\/li>\n<\/ul>\n\n\n\n<p>MCC Oriental consid\u00e8re ce projet comme une r\u00e9f\u00e9rence pour les applications de grues m\u00e9tallurgiques ultra-robustes et \u00e0 haute temp\u00e9rature, et comme une \u00e9tape importante dans la modernisation de la logistique des aci\u00e9ries vers des op\u00e9rations efficaces, s\u00fbres et \u00e9cologiques.<\/p>\n\n\n\n<div id=\"p_author\"><div class=\"left\">\r\n<img loading=\"lazy\" decoding=\"async\" src=\"\/wp-content\/uploads\/2024\/06\/cindy.jpg\" width=\"150\" height=\"150\" alt=\"\" class=\"authorphoto\">\r\n<div class=\"name\">Cindy<\/div>\r\n<\/div>\r\n<div class=\"rightfinfo\">\r\n<div>WhatsApp\u00a0: <a href=\"https:\/\/wa.me\/+8619137386654\" class=\"whatsapp\" target=\"_blank\" rel=\"noopener\">+86-19137386654<\/a><\/div>\r\n<div>E-mail: <a href=\"mailto:cindywang@hndfcrane.com\" class=\"PC_email\" id=\"content_email\">cindywang@hndfcrane.com<\/a><\/div>\r\n<p style=\"margin-top:16px\">Je suis Cindy, j&#39;ai 10 ans d&#39;exp\u00e9rience professionnelle dans le secteur des grues et j&#39;ai accumul\u00e9 une richesse de connaissances professionnelles. J&#39;ai choisi des grues satisfaisantes pour plus de 500 clients. Si vous avez des besoins ou des questions concernant les grues, n&#39;h\u00e9sitez pas \u00e0 me contacter, j&#39;utiliserai mon expertise et mon exp\u00e9rience pratique pour vous aider \u00e0 r\u00e9soudre le probl\u00e8me !<\/p>\r\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"Customer Profile \u2013 MCC Oriental MCC Oriental is a leading engineering and equipment supplier in the metallurgical sector, specializing in the construction and upgrading of large-scale steelmaking plants. The company provides integrated solutions covering steelmaking, continuous casting, rolling, and metallurgical logistics. To enhance the efficiency and safety of molten metal transportation in its steelmaking workshop, [&hellip;]","protected":false},"featured_media":14452,"parent":0,"menu_order":0,"template":"","posts_category":[10],"posts_tag":[104,704],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/14450"}],"collection":[{"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/14450\/revisions"}],"predecessor-version":[{"id":14455,"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/14450\/revisions\/14455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/media\/14452"}],"wp:attachment":[{"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/media?parent=14450"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/posts_category?post=14450"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.hndfcrane.com\/fr\/wp-json\/wp\/v2\/posts_tag?post=14450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}