{"id":14466,"date":"2025-11-26T09:14:05","date_gmt":"2025-11-26T09:14:05","guid":{"rendered":"https:\/\/www.hndfcrane.com\/?post_type=posts&#038;p=14466"},"modified":"2025-11-26T09:14:18","modified_gmt":"2025-11-26T09:14:18","slug":"mg60t-gantry-crane-for-heavy-wind-turbine-blade-and-nacelle-handling","status":"publish","type":"posts","link":"https:\/\/www.hndfcrane.com\/sv\/posts\/mg60t-gantry-crane-for-heavy-wind-turbine-blade-and-nacelle-handling\/","title":{"rendered":"MG60t portalkran f\u00f6r hantering av tunga vindturbinblad och naceller"},"content":{"rendered":"<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"870\" height=\"580\" src=\"https:\/\/www.hndfcrane.com\/wp-content\/uploads\/2025\/11\/MG60t-Gantry-Crane-for-Heavy-Wind-Turbine-Blade-and-Nacelle-Handling.jpg\" alt=\"\" class=\"wp-image-14467\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Kundprofil \u2013 Daoda Wind Energy<\/h2>\n\n\n\n<p>Daoda Wind Energy \u00e4r ett ledande f\u00f6retag inom tillverkning av utrustning f\u00f6r f\u00f6rnybar energi, specialiserat p\u00e5 produktion och installation av vindturbiner. F\u00f6retaget fokuserar p\u00e5 innovativa l\u00f6sningar f\u00f6r storskaliga vindkraftsprojekt, inklusive h\u00f6gkapacitetsturbiner och offshore-installationer.<\/p>\n\n\n\n<p>F\u00f6r att f\u00f6rb\u00e4ttra effektiviteten och s\u00e4kerheten vid installation av stora vindturbinkomponenter samarbetade Daoda Wind Energy med DAFANG CRANE f\u00f6r att drifts\u00e4tta MG60t. <a href=\"https:\/\/www.hndfcrane.com\/sv\/double-girder-gantry-cranes\/\" target=\"_blank\" rel=\"noreferrer noopener\">Dubbelbalk portalkran<\/a>, vilket uppn\u00e5r ett genombrott inom tunga lyftoperationer p\u00e5 h\u00f6g h\u00f6jd.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Projekt\u00f6versikt \u2013 MG60t portalkran med dubbelbalk<\/h2>\n\n\n\n<p>F\u00f6r att f\u00f6rb\u00e4ttra installationseffektiviteten hos stora vindkraftverk introducerade Daoda Wind Energy portalkranen MG60t med tv\u00e5balkar, med:<\/p>\n\n\n\n<ul>\n<li>L\u00e5dliknande dubbelbalkskonstruktion<\/li>\n\n\n\n<li>Sp\u00e4nnvidd: 40 m<\/li>\n\n\n\n<li>Lyfth\u00f6jd: 35 m<\/li>\n\n\n\n<li>Hydrauliskt synkront lyftsystem: 8 lyftpunkter, synkroniseringsfel \u22640,1 mm<\/li>\n\n\n\n<li>Driftl\u00e4gen: Tr\u00e5dl\u00f6s fj\u00e4rrkontroll + hyttman\u00f6vrering<\/li>\n\n\n\n<li>Standard\u00f6verensst\u00e4mmelse: GB\/T 3811 krankonstruktionskod, ISO 12482 s\u00e4kerhetscertifiering<\/li>\n\n\n\n<li>Milj\u00f6anpassning: H\u00f6g h\u00f6jd, l\u00e5nga sp\u00e4nningar f\u00f6r installation av vindkraftverk<\/li>\n<\/ul>\n\n\n\n<p>Detta system gjorde det m\u00f6jligt f\u00f6r Daoda Wind Energy att g\u00f6ra ett stort spr\u00e5ng inom s\u00e4ker och effektiv h\u00f6gh\u00f6jdslyftning av utrustning f\u00f6r f\u00f6rnybar energi.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">K\u00e4rnapplikationsscenarier<\/h2>\n\n\n\n<p><strong>Lyftning av vindturbintornsektion<\/strong><\/p>\n\n\n\n<ul>\n<li>Uppgift: Lyfta tornsektioner som v\u00e4ger 60 ton (25 m l\u00e5nga, \u00d8 4,5 m)<\/li>\n\n\n\n<li>Hydrauliskt synkront system med laserjustering<\/li>\n\n\n\n<li>Installationstiden minskades fr\u00e5n 4 timmar till 1,5 timmar<\/li>\n\n\n\n<li>Vertikalitetsavvikelse kontrollerad inom 1\/1000<\/li>\n<\/ul>\n\n\n\n<p><strong>Nacellinversion och installation<\/strong><\/p>\n\n\n\n<ul>\n<li>Uppgift: 180\u00b0 luftinversion av 80-tons turbinmotorgondel<\/li>\n\n\n\n<li>Dubbelbalkskonstruktion minskar nedb\u00f6jning<\/li>\n\n\n\n<li>Smidig inversion, minimerar svajning<\/li>\n\n\n\n<li>Operativ risk p\u00e5 h\u00f6g h\u00f6jd minskad med 80%<\/li>\n<\/ul>\n\n\n\n<p><strong>Synkroniserad bladhantering med flera kranar<\/strong><\/p>\n\n\n\n<ul>\n<li>Uppgift: Synkron lyftning av tre turbinblad (15 ton vardera)<\/li>\n\n\n\n<li>Exakt hastighets- och positionssynkronisering f\u00f6r flera kranar<\/li>\n\n\n\n<li>Operativ effektivitet +45%<\/li>\n\n\n\n<li>Kostnadsreduktion 30%<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Viktiga tekniska innovationer<\/h2>\n\n\n\n<p><strong>Hydrauliskt synkront lyftsystem<\/strong><\/p>\n\n\n\n<ul>\n<li>Integrerade proportionella ventiler + f\u00f6rskjutningssensorer f\u00f6r millimetersynkronisering \u00f6ver 8 lyftpunkter<\/li>\n\n\n\n<li>N\u00f6dmanuell pump f\u00f6r s\u00e4ker s\u00e4nkning vid str\u00f6mavbrott<\/li>\n<\/ul>\n\n\n\n<p><strong>Intelligent s\u00e4kerhets\u00f6vervakning<\/strong><\/p>\n\n\n\n<ul>\n<li>Realtids\u00f6vervakning av 12 viktiga parametrar, inklusive balksp\u00e4nning och bens\u00e4ttning<\/li>\n\n\n\n<li>3D-laserkollisionssystem (f\u00f6rvarningsavst\u00e5nd 50 m, \u00b110 cm noggrannhet)<\/li>\n<\/ul>\n\n\n\n<p><strong>Milj\u00f6anpassad design<\/strong><\/p>\n\n\n\n<ul>\n<li>Huvudbalkar tillverkade av h\u00f6gh\u00e5llfast st\u00e5l Q460E<\/li>\n\n\n\n<li>Vindmotst\u00e5ndsklass 12<\/li>\n\n\n\n<li>Elsystem IP65-klassat, l\u00e4mpligt f\u00f6r dammiga milj\u00f6er med h\u00f6g temperatur<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Kundf\u00f6rdelar och prestanda<\/h2>\n\n\n\n<p><strong>Installationseffektivitet<\/strong><\/p>\n\n\n\n<ul>\n<li>Installationscykeln f\u00f6r vindkraftverk f\u00f6rkortad med 30%<\/li>\n\n\n\n<li>Daglig lyftkapacitet \u00f6versteg 120 ton<\/li>\n<\/ul>\n\n\n\n<p><strong>Kostnadsoptimering<\/strong><\/p>\n\n\n\n<ul>\n<li>Minskad personal p\u00e5 h\u00f6g h\u00f6jd med 60%<\/li>\n\n\n\n<li>\u00c5rlig arbetsbesparing p\u00e5 cirka 1,8 miljoner RMB<\/li>\n<\/ul>\n\n\n\n<p><strong>S\u00e4kerhetsprestanda<\/strong><\/p>\n\n\n\n<ul>\n<li>Noll s\u00e4kerhetsincidenter p\u00e5 tre \u00e5r<\/li>\n\n\n\n<li>Certifierad enligt ISO 45001 arbetsmilj\u00f6standard<\/li>\n<\/ul>\n\n\n\n<p>Detta projekt positionerar Daoda Wind Energy som en riktm\u00e4rke inom ultratunga portalkranar p\u00e5 h\u00f6g h\u00f6jd, vilket driver tekniska uppgraderingar inom installation av utrustning f\u00f6r f\u00f6rnybar energi.<\/p>\n\n\n\n<div id=\"p_author\"><div class=\"left\">\r\n<img loading=\"lazy\" decoding=\"async\" src=\"\/wp-content\/uploads\/2024\/06\/cindy.jpg\" width=\"150\" height=\"150\" alt=\"\" class=\"authorphoto\">\r\n<div class=\"name\">Cindy<\/div>\r\n<\/div>\r\n<div class=\"rightfinfo\">\r\n<div>WhatsApp: <a href=\"https:\/\/wa.me\/+8619137386654\" class=\"whatsapp\" target=\"_blank\" rel=\"noopener\">+86-19137386654<\/a><\/div>\r\n<div>E-post: <a href=\"mailto:cindywang@hndfcrane.com\" class=\"PC_email\" id=\"content_email\">cindywang@hndfcrane.com<\/a><\/div>\r\n<p style=\"margin-top:16px\">Jag \u00e4r Cindy, med 10 \u00e5rs arbetslivserfarenhet inom kranbranschen och samlat p\u00e5 mig en m\u00e4ngd professionell kunskap. Jag har valt de tillfredsst\u00e4llande kranarna f\u00f6r 500+ kunder. Om du har n\u00e5gra behov eller fr\u00e5gor om kranar \u00e4r du v\u00e4lkommen att kontakta mig, jag kommer att anv\u00e4nda min expertis och praktiska erfarenhet f\u00f6r att hj\u00e4lpa dig att l\u00f6sa problemet!<\/p>\r\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"Client Profile \u2013 Daoda Wind Energy Daoda Wind Energy is a leading company in renewable energy equipment manufacturing, specializing in wind turbine production and installation. The company focuses on innovative solutions for large-scale wind power projects, including high-capacity turbines and offshore installations. To improve the efficiency and safety of installing large wind turbine components, Daoda [&hellip;]","protected":false},"featured_media":14467,"parent":0,"menu_order":0,"template":"","posts_category":[10],"posts_tag":[14,704],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/14466"}],"collection":[{"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/14466\/revisions"}],"predecessor-version":[{"id":14470,"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/14466\/revisions\/14470"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/media\/14467"}],"wp:attachment":[{"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/media?parent=14466"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/posts_category?post=14466"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.hndfcrane.com\/sv\/wp-json\/wp\/v2\/posts_tag?post=14466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}