Nyumbani►Kesi►MG80t Double Girder Gantry Crane kwa Miradi ya Kuinua Muundo wa Juu wa Miundo ya Chuma
Uzalishaji wa MwakaCranes 70,000
Vifaa vya UzalishajiSeti 1,500
Utafiti na MaendeleoSmart Crane
MG80t Double Girder Gantry Crane kwa Miradi ya Kuinua Muundo wa Juu wa Miundo ya Chuma
Novemba 26, 2025
China State Construction Steel Structure Corporation has achieved a breakthrough in super-high-rise steel-structure construction by deploying the MG80t double girder gantry crane. Featuring a hydraulic synchronous lifting system, an intelligent monitoring platform, and a double-girder box-type structure, the equipment significantly enhances lifting efficiency and safety. This project supports the industry’s transition toward industrialized and intelligent construction, extending the application of gantry cranes into ultra-heavy-duty and super-high-rise scenarios and setting a new benchmark for technological advancement.
China State Construction Steel Structure Corporation Overview
China State Construction Steel Structure Corporation was established in 1996. It serves as the dedicated steel-structure subsidiary of China State Construction Engineering Corporation (CSCEC), one of the world’s largest construction groups. The company is a nationally recognized high-tech enterprise and one of Chinanese first prefabricated building industrial bases. It offers end-to-end services covering R&D, design, fabrication, installation and inspection. With a nationwide footprint and an international presence spanning the Middle East, North Africa and Southeast Asia, the company delivers steel-structure solutions for large-scale projects globally.
Double Girder Gantry Crane Equipment Overview
To meet the demanding lifting requirements of super high rise steel structure construction, China State Construction Steel Structure Corporation introduced the MG80t double girder gantry crane. The double girder gantry crane adopts a box-type double-girder structure with a span of 42 meters and a lifting height of 36 meters. It is equipped with a hydraulic synchronous lifting system (8 lifting points, synchronous deviation ≤0.1 mm) and supports both wireless remote control and cabin operation.
The entire system complies with the GB/T 3811 design standard and is certified under ISO 12482, making it particularly suitable for the complex conditions of construction sites.
Task: Lifting a 75-ton steel column (28 m long, 1.2 m diameter)
Result: The hydraulic synchronous system combined with a laser alignment device reduced lifting time from 3 hours to 1.5 hours, while maintaining a verticality deviation within 1/1000.
Result: The double-girder design minimizes deflection, improving node-to-node alignment accuracy by 60% and reducing high-altitude operational risks by 80%.
Multi-Crane Coordinated Lifting
Task: Synchronously lifting four curtain-wall units at a height of 100 meters (total weight 120 tons)
Result: The coordinated control system ensures synchronized speed and positioning, improving operational efficiency by 45% and reducing costs by 30%.
Mimi ni Cindy, nina uzoefu wa miaka 10 katika tasnia ya kreni na nimekusanya maarifa mengi ya kitaaluma. Nimechagua korongo za kuridhisha kwa wateja 500+. Ikiwa una mahitaji yoyote au maswali kuhusu cranes, tafadhali jisikie huru kuwasiliana nami, nitatumia ujuzi wangu na uzoefu wa vitendo kukusaidia kutatua tatizo!