집►사례►YZ160t Foundry Overhead Crane for Efficient and Safe Molten Metal Handling in Steel Plants
연산크레인 70,000대
생산설비1,500 세트
연구개발스마트 크레인
YZ160t Foundry Overhead Crane for Efficient and Safe Molten Metal Handling in Steel Plants
2025년 11월 28일
Client Profile
Shijiazhuang Iron & Steel Group (Shisteel) is a large-scale integrated steel manufacturer specializing in high-quality structural steel, alloy steel, and special steel products. With continuous expansion of its steelmaking capacity and increasing requirements for safety and efficiency, the group launched an upgrade project for molten metal handling in its steelmaking workshop.
To support this upgrade, Shisteel introduced the DAFANG CRANE YZ160t Foundry Overhead Crane to enhance ladle handling reliability, operational safety, and production efficiency.
Project Overview
Shisteel adopted the YZ160t Foundry Overhead Crane to significantly improve molten metal handling efficiency within the steelmaking workshop. The crane features a four-girder, four-rail double-main-girder design with a 28m span, a main hoist lifting height of 22m, and an auxiliary hoist lifting height of 24m. Equipped with a hydraulic synchronous lifting system—featuring five lifting points with a synchronization accuracy of ≤0.1 mm—the crane supports both wireless remote control and operator cabin modes.
The equipment complies with GB/T 3811 design standards and ISO 12482 safety certification, and is engineered specifically for high-temperature and heavy-dust metallurgical environments.
Key Application Scenarios
Hot Metal Ladle Transfer
Task: Lifting 140-ton hot metal ladles (diameter 3.0m, height 4.0m)
Result: Hydraulic synchronization + laser alignment reduced lifting cycle time from 1.5 hours to 40 minutes
Ladle vertical deviation controlled within 1/1000, ensuring precise and stable ladle tilting and movement
저는 신디입니다. 크레인 산업에서 10년의 근무 경험을 쌓았고 풍부한 전문 지식을 축적했습니다. 저는 500명 이상의 고객을 위해 만족스러운 크레인을 선택했습니다. 크레인에 대한 필요 사항이나 질문이 있으면 언제든지 저에게 연락하세요. 저는 제 전문 지식과 실무 경험을 활용하여 문제를 해결하도록 도와드리겠습니다!