Chifeng Zhongtang Iron & Steel is a leading steel manufacturer in northern China, specializing in high-temperature metallurgical production, including ironmaking, steelmaking, and continuous casting.
To support its long-term strategy of upgrading production efficiency and workplace safety, the company has been continuously introducing intelligent and green manufacturing technologies. One of its key modernization initiatives is optimizing molten metal handling in its steelmaking workshop—an operation that demands extreme reliability, precision, and safety.
Project Overview
To enhance molten metal handling efficiency and safety, Chifeng Zhongtang deployed our YZ160t 국자 오버 헤드 크레인, a heavy-duty solution purpose-built for high-temperature steelmaking environments.
The crane features a four-girder, four-rail dual-trolley structure, a 28 m span, and lifting heights of 22 m (main trolley) and 24 m (auxiliary trolley).
It is equipped with a hydraulic synchronous lifting system (5 lifting points, ≤0.1 mm synchronization accuracy) and supports dual operation modes: wireless remote control & operator cabin.
The entire system meets GB/T 3811 crane design standards and is certified to ISO 12482, ensuring safety and reliability in high-temperature, dusty environments typical of metallurgy.
Core Application Scenarios
Hot Metal Ladle Transfer
Task: Lifting a 140-ton molten iron ladle (Ø3.0 m, H4.0 m)
Results: Hydraulic synchronous lifting + laser alignment reduced handling time
from 1.5 hours to 40 minutes
Vertical deviation controlled within 1/1000, significantly improving precision and safety
Steel Billet Continuous Casting
Task: Repetitive lifting of 80-ton billets (10 m × 1.2 m)
저는 신디입니다. 크레인 산업에서 10년의 근무 경험을 쌓았고 풍부한 전문 지식을 축적했습니다. 저는 500명 이상의 고객을 위해 만족스러운 크레인을 선택했습니다. 크레인에 대한 필요 사항이나 질문이 있으면 언제든지 저에게 연락하세요. 저는 제 전문 지식과 실무 경험을 활용하여 문제를 해결하도록 도와드리겠습니다!