Suwnica bramowa dwudźwigarowa MG80t do projektów podnoszenia wysokich konstrukcji stalowych
26 listopada 2025
China State Construction Steel Structure Corporation has achieved a breakthrough in super-high-rise steel-structure construction by deploying the MG80t double girder gantry crane. Featuring a hydraulic synchronous lifting system, an intelligent monitoring platform, and a double-girder box-type structure, the equipment significantly enhances lifting efficiency and safety. This project supports the industry’s transition toward industrialized and intelligent construction, extending the application of gantry cranes into ultra-heavy-duty and super-high-rise scenarios and setting a new benchmark for technological advancement.
China State Construction Steel Structure Corporation Overview
China State Construction Steel Structure Corporation was established in 1996. It serves as the dedicated steel-structure subsidiary of China State Construction Engineering Corporation (CSCEC), one of the world’s largest construction groups. The company is a nationally recognized high-tech enterprise and one of Chinanese first prefabricated building industrial bases. It offers end-to-end services covering R&D, design, fabrication, installation and inspection. With a nationwide footprint and an international presence spanning the Middle East, North Africa and Southeast Asia, the company delivers steel-structure solutions for large-scale projects globally.
Double Girder Gantry Crane Equipment Overview
To meet the demanding lifting requirements of super high rise steel structure construction, China State Construction Steel Structure Corporation introduced the MG80t double girder gantry crane. The double girder gantry crane adopts a box-type double-girder structure with a span of 42 meters and a lifting height of 36 meters. It is equipped with a hydraulic synchronous lifting system (8 lifting points, synchronous deviation ≤0.1 mm) and supports both wireless remote control and cabin operation.
The entire system complies with the GB/T 3811 design standard and is certified under ISO 12482, making it particularly suitable for the complex conditions of construction sites.
Task: Lifting a 75-ton steel column (28 m long, 1.2 m diameter)
Result: The hydraulic synchronous system combined with a laser alignment device reduced lifting time from 3 hours to 1.5 hours, while maintaining a verticality deviation within 1/1000.
Result: The double-girder design minimizes deflection, improving node-to-node alignment accuracy by 60% and reducing high-altitude operational risks by 80%.
Multi-Crane Coordinated Lifting
Task: Synchronously lifting four curtain-wall units at a height of 100 meters (total weight 120 tons)
Result: The coordinated control system ensures synchronized speed and positioning, improving operational efficiency by 45% and reducing costs by 30%.
Jestem Cindy, mam 10 lat doświadczenia w branży dźwigowej i zgromadziłam bogactwo wiedzy zawodowej. Wybrałam satysfakcjonujące dźwigi dla ponad 500 klientów. Jeśli masz jakiekolwiek potrzeby lub pytania dotyczące dźwigów, skontaktuj się ze mną, wykorzystam swoją wiedzę specjalistyczną i praktyczne doświadczenie, aby pomóc Ci rozwiązać problem!