MG60t 龙门起重机,用于重型风力涡轮机叶片和机舱搬运

2025 年 11 月 26 日
MG60t 龙门起重机,用于重型风力涡轮机叶片和机舱搬运

Client Profile – Daoda Wind Energy

Daoda Wind Energy is a leading company in renewable energy equipment manufacturing, specializing in wind turbine production and installation. The company focuses on innovative solutions for large-scale wind power projects, including high-capacity turbines and offshore installations.

To improve the efficiency and safety of installing large wind turbine components, Daoda Wind Energy collaborated with DAFANG CRANE to deploy the MG60t 双梁门式起重机, achieving a breakthrough in high-altitude, heavy-duty lifting operations.

Project Overview – MG60t Double Girder Gantry Crane

To enhance the installation efficiency of large wind turbines, Daoda Wind Energy introduced the MG60t Double-Girder Gantry Crane, featuring:

  • Box-type double-girder structure
  • Span: 40 m
  • Lifting height: 35 m
  • Hydraulic Synchronous Hoisting System: 8 lifting points, synchronization error ≤0.1 mm
  • Operation Modes: Wireless remote control + cabin operation
  • Standards Compliance: GB/T 3811 crane design code, ISO 12482 safety certification
  • Environmental Adaptation: High-altitude, long-span operations for wind turbine installation

This system enabled Daoda Wind Energy to achieve a major leap in safe and efficient high-altitude lifting for renewable energy equipment.

核心应用场景

Wind Turbine Tower Section Lifting

  • Task: Lifting tower sections weighing 60 tons (25 m long, Ø 4.5 m)
  • Hydraulic synchronous system with laser alignment
  • Installation time reduced from 4 hours to 1.5 hours
  • Verticality deviation controlled within 1/1000

Nacelle Inversion and Installation

  • Task: 180° aerial inversion of 80-ton turbine nacelle
  • Double-girder design reduces deflection
  • Smooth inversion, minimizing sway
  • High-altitude operational risk reduced by 80%

Multi-Crane Synchronized Blade Handling

  • Task: Synchronous lifting of three turbine blades (15 tons each)
  • Precise multi-crane speed and position synchronization
  • Operational efficiency +45%
  • Cost reduction 30%

Key Technological Innovations

Hydraulic Synchronous Hoisting System

  • Integrated proportional valves + displacement sensors for millimeter-level synchronization across 8 lifting points
  • Emergency manual pump for safe lowering during power failures

智能安全监控

  • Real-time monitoring of 12 key parameters, including girder stress and leg settlement
  • 3D laser anti-collision system (pre-warning distance 50 m, ±10 cm accuracy)

Environment-Adapted Design

  • Main girders fabricated from Q460E high-strength steel
  • Wind resistance rating Class 12
  • Electrical system IP65 rated, suitable for dusty, high-temperature environments

Customer Benefits & Performance

Installation Efficiency

  • Wind turbine installation cycle shortened by 30%
  • Daily lifting capacity exceeded 120 tons

Cost Optimization

  • Reduced high-altitude personnel by 60%
  • Annual labor savings approx. 1.8 million RMB

Safety Performance

  • Zero safety incidents in three years
  • Certified to ISO 45001 Occupational Health & Safety Standard

This project positions Daoda Wind Energy as a benchmark in ultra-heavy, high-altitude gantry crane applications, driving technological upgrades in renewable energy equipment installation.