Single Girder Grab Overhead Crane Exported to Pakistan

November 29, 2025
Grab overhead crane

Project Details

The client is a wastewater treatment plant. The grab overhead crane needed to be built on a pool, but the pool walls were very thin, and the crane’s column flange base plate required a large space for support. After six months repeated communication and numerous revisions, the client finally approved the final solution, and the crane was erected without altering the ground foundation. Installation is now complete, and all components fit the client’s site perfectly. The client is delighted with the performance.

Grab OVerhead Crane Product Introduction

  • The grab bucket eot crane box-shaped double-beam structure matches the A6 heavy-duty working level (JC=40%).
  • The grab overhead crane fatigue strength of the main beam is more than 30% higher than that of conventional A3-A5 models.
  • Grab bucket overhead crane adapt to high-frequency operation scenarios such as power plants and docks.
  • Grab bucket bridge crane equipped with IP44-54 YZR type protective motor.
  • Grab eot crane equipped with a polyurethane buffer, the crane buffer can absorb the operating energy of the crane system or trolley and reduce the impact.
  • Grab overhead crane an anti-collision system should be set up between grab overhead crane on the same track or between double trolleys on the same beam.

Installation Site Display

Grab overhead crane install3
Grab overhead crane install
Grab overhead crane install2
cindy
Cindy
WhatsApp: +86-19137386654

I am Cindy, with 10 years of working experience in the crane industry and accumulated a wealth of professional knowledge. I have chosen the satisfying cranes for 500+ customers. If you have any needs or questions about cranes, please feel free to contact me, I will use my expertise and practical experience to help you solve the problem!

Send Your Inquiry

WeChat WeChat
Click or drag files to this area to upload. You can upload up to 5 files.